Skip to content

About us

Bathrooms are all we do

We started Remodler because we kept hearing the same story: a one-line quote, a handshake, then a list of new problems the day after demolition. So we do one room, bathrooms, and we put every tile, mixer and fitting in writing before anyone picks up a hammer.

Our supervisors are on the payroll, not subcontracted out, and the plumbers, sparkies, waterproofers and tilers are people we've worked with for years. Every job carries fixed quote, a certified waterproofing, and the same crew from your first call to handover.

3–4 weeks on site

Most bathrooms finished in three to four weeks, not months

Certified waterproofing

AS 3740 compliant, so leaks don't come back

Fixed quote

Itemised price before work starts, no surprise extras

Our team

Licensed tradies, every project, every time

A licensed team that treats your home with care and shows up with the experience to get it right. From demolition through to handover, the same crew is on site, so the work is consistent and the finish is something we're proud to put our name on.

Remodler bathroom renovators in navy branded t-shirts standing in a completed Sydney bathroom

The same crew from start to finish

You meet the tradespeople who do the work. No rotating subbies and no unfamiliar faces turning up mid-job.

Remodler branded van and ute parked on the street outside a Sydney home with a tradie in hi-vis standing nearby

Licensed trades, branded vehicles

We park on the street, not across your driveway, so you can come and go as normal.

Our work

See the difference for yourself

Every one of these was a family's only bathroom. Drag each slider to see where it started and the suburb it was done in.

WoodcroftMain bathroom + ensuite5 weeks on site

One Bathroom Turned Into Two

A single long bathroom in a Woodcroft family home, reworked into a main bathroom and a separate ensuite so a household of five stopped queueing every morning.

Quakers HillMain bathroom4 weeks on site

Luxury Main Bathroom

A tired 1990s main bathroom stripped back to studs and rebuilt as a bright, hotel-style room with marble-look porcelain, a lit niche and a stone-top timber vanity.

How it works

What happens once you say yes?

Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.

Stage 1

Measure, design and written quote

We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.

Stage 2

Strip-out, rough-in and waterproofing

Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.

Stage 3

Tiling, fit-off and handover

Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.

View Projects

Reviews

What our customers say

Read all reviews