Skip to content

Our work · Before & after

See the difference a proper rebuild makes

Finished bathrooms across the Hills District and Western Sydney. Drag the slider on each project to see where it started, or click any photo to expand it. Every one was quoted in writing, waterproofed to AS 3740 and finished by the same crew.

View Projects

3–4 weeks on site

Most bathrooms finished in three to four weeks, not months

Certified waterproofing

AS 3740 compliant, so leaks don't come back

Fixed quote

Itemised price before work starts, no surprise extras

WoodcroftMain bathroom + ensuite

One Bathroom Turned Into Two

Timeline
5 weeks on site
Drag the slider — before and after in Woodcroft. Click the expand icon to view full-screen.

WoodcroftA single long bathroom in a Woodcroft family home, reworked into a main bathroom and a separate ensuite so a household of five stopped queueing every morning.

  • Layout redesign — one room split into two wet areas
  • New plumbing and drainage set-out, re-waterproofed to AS 3740
  • Large-format stone-look porcelain floor and wall tiling
  • Timber-look wall-hung vanities, backlit mirrors and frameless glass

More of this bathroom

Quakers HillMain bathroom

Luxury Main Bathroom

Timeline
4 weeks on site
Drag the slider — before and after in Quakers Hill. Click the expand icon to view full-screen.

Quakers HillA tired 1990s main bathroom stripped back to studs and rebuilt as a bright, hotel-style room with marble-look porcelain, a lit niche and a stone-top timber vanity.

  • Full strip-out and certified waterproofing
  • Marble-look large-format porcelain, floor to ceiling
  • Frameless shower with LED-lit niche and linear drain
  • Timber vanity with stone top and black vessel basin

More of this bathroom

Quakers HillFamily bathroom

Family Bathroom Rebuild

Timeline
4 weeks on site
Drag the slider — before and after in Quakers Hill. Click the expand icon to view full-screen.

Quakers HillBeige tiles, a laminate vanity and a leaking shower base were replaced with warm veined porcelain, a wall-hung vanity and a fully waterproofed walk-in shower.

  • Complete strip-out, new waterproofing membrane
  • Veined stone-look porcelain to full ceiling height
  • Wall-hung timber vanity with integrated stone basin
  • Backlit mirror, LED niches and semi-frameless screen

More of this bathroom

Marsden ParkEnsuite

Gold & Marble Ensuite

Timeline
4 weeks on site
Drag the slider — before and after in Marsden Park. Click the expand icon to view full-screen.

Marsden ParkA statement ensuite for a new Marsden Park home — double gold vessel basins, brushed brass tapware, a freestanding bath and a black feature shower.

  • Double vanity with stone top and gold vessel basins
  • Freestanding bath with floor-mounted mixer
  • Black feature tiling to the shower, marble-look elsewhere
  • Concealed cistern, wall-hung pan and brushed brass fixtures

More of this bathroom

MintoSmall bathroom

Walk-In Shower Conversion

Timeline
3 weeks on site
Drag the slider — before and after in Minto. Click the expand icon to view full-screen.

MintoA cramped bathroom with a framed shower box, opened up into a hobless walk-in shower with a linear drain, hexagon feature tiling and a round backlit mirror.

  • Hobless walk-in shower with linear strip drain
  • Screed and falls re-set, waterproofed to AS 3740
  • Hexagon feature tiling with concrete-look large format
  • Wall-hung vanity, stone basin and round mirror

More of this bathroom

BlacktownSmall bathroom

Frameless Shower Renovation

Timeline
3 weeks on site

BlacktownA compact Blacktown bathroom rebuilt with a frameless glass shower, matte black tapware and a full-height stone-look tile that makes the room feel far bigger.

  • Frameless glass shower panel with tiled niche
  • Matte black rail shower and mixer set
  • Stone-look porcelain floor to ceiling
  • Back-to-wall pan and new floor waste falls

Free on-site measure and a written, itemised quote for your bathroom renovation.

How it works

What happens once you say yes?

Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.

Stage 1

Measure, design and written quote

We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.

Stage 2

Strip-out, rough-in and waterproofing

Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.

Stage 3

Tiling, fit-off and handover

Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.

Reviews

What our customers say

Read all reviews

Free quote

Ready for a bathroom you're happy to show people?

Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.

Call 0469 905 105