Skip to content

Full bathroom renovations

Bathroom Renovation Company for the Hills & Western Sydney

Most people we meet have had one quote that looked too cheap and one that made no sense, and neither told them what they were actually buying. The question we get asked first is always the same one: will the price hold, and will anyone turn up?

Here's how we work. You get a written contract with every tile, tap and fitting listed, and the same crew on site until it's finished, usually three to four weeks. Bathrooms are what we specialise in, and it shows: the waterproofing, the falls and the joinery still hold up years after the photos stop mattering.

Completed Sydney bathroom renovation with double stone vanity and frameless shower

3–4 weeks on site

Most bathrooms finished in three to four weeks, not months

Certified waterproofing

AS 3740 compliant, so leaks don't come back

Fixed quote

Itemised price before work starts, no surprise extras

What's included

What's Included in a Full Bathroom Renovation

A quote that leaves these items out isn't cheaper — it's incomplete. This is what a standard Remodler bathroom covers, and it's all listed in your written quote.

Demolition & waste

Stripped back to frame. We test for asbestos, remove it properly if it's there, and take all the rubbish with us.

Plumbing & electrical

Licensed rough-in and fit-off. If the old drainage is past it, we replace it rather than hope.

Included in the build

Bathroom Design & Planning

Design & documentation

A measured layout, a 3D concept and every fixture listed by name before you sign anything.

Included in the build

Bathroom Waterproofing to AS 3740

Waterproofing

Done and certified to AS 3740 by a licensed waterproofer, with photos at every stage.

Included in the build

Bathroom Tiling, Vanities & Fixtures

Screed & tiling

Falls set properly to the waste, large-format wall and floor tiles, mitred corners, epoxy grout in the shower.

Joinery & stone

Vanity, shaving cabinet and stone tops measured in the finished room, not off a drawing.

Ventilation & lighting

An exhaust fan sized for the room, and lighting on separate switches so you're not stuck with one setting.

Included in the build

Shower & Walk-In Shower Renovations

Glass & mirrors

Frameless or semi-frameless screens, measured after the tiling is done so they actually fit.

Shower floors and drainage

The shower floor, waste and waterproofing are planned together before screeding and tiling. Screen measurements follow the finished tilework.

Cost and scope

How Much Does a Bathroom Renovation Cost?

Most full bathroom renovations in Sydney land between $22,000 and $38,000 for a standard 6–8m² room, with premium and larger builds running $40,000 to $70,000+. The variables that move the number most are whether fixtures stay in place, the tile size and format, whether the room contains asbestos, and the standard of tapware and joinery. We give you a detailed written contract after the site measure so the scope and price are clear before you sign.

Bathroom Renovation Services

Every bathroom we build across Sydney starts the same way: a measure on site, a fixed itemised quote, then one dedicated crew from demolition to final clean.

Bathroom Makeovers

New tiles, vanity, tapware and screen. The plumbing stays where it is.

Bathroom Refurbishment

The room stays where it is. New tiles, new waterproofing, new fittings over the existing layout.

Bathroom Upgrades

One thing done properly - a shower screen, better lighting or storage - without a strip-out.

Bathroom Design

Layout and finishes settled before demolition, so the room works before a tile is ordered.

Bathroom Waterproofing

AS 3740 membrane across the whole wet area, with the certificate issued at handover.

Bathroom Tiling

Large-format, rectified and mosaic work - screeds and falls set for drainage, not for speed.

Shower Renovations

Walk-in, frameless or step-free, rebuilt with the fall, waste and waterproofing done right.

Questions

Bathroom renovation questions

Short answers to the questions we get asked most often.

Free on-site measure and a written, itemised quote for your bathroom renovation.

How it works

Our Bathroom Renovation Process

Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.

Stage 1

Measure, design and written quote

We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.

Stage 2

Strip-out, rough-in and waterproofing

Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.

Stage 3

Tiling, fit-off and handover

Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.

View Projects

Reviews

Bathroom Renovation Reviews

Read all reviews

Free quote

Get your free measure and written quote

Tell us your suburb and roughly what you're after. We measure the room on site, then send a quote with every tile, mixer and fitting listed, so you know exactly what you're paying for before anything starts.

  • Free on-site measure and a scaled layout
  • A written contract with every item listed
  • Licensed, insured, fully documented
  • The same crew from the first call to handover

Free quote

Request your quote

Loading your quote form…

Go to the quote page

Answers

Bathroom Renovation FAQs

Free quote

Ready for a bathroom you're happy to show people?

Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.

Call 0469 905 105