Our Bathroom Renovation Process, Week by Week

No guessing at what stage the job is up to, and no waiting weeks for a trade to show up. Here's what happens each week, who is on site, and the few decisions we need from you.

View Projects

3–4 weeks on site

Most bathrooms finished in three to four weeks, not months

Certified waterproofing

AS 3740 compliant, so leaks don't come back

Fixed quote

Itemised price before work starts, no surprise extras

How it works

How Long Does a Bathroom Renovation Take?

Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.

Stage 1

Step 1: Free Measure, Design and Written Quote

We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.

Stage 2

Step 2: Strip-Out, Rough-In and Waterproofing

Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.

Stage 3

Step 3: Tiling, Fit-Off and Handover

Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.

Week by week

Bathroom Renovation Timeline Week by Week

Larger rooms, layout changes and asbestos removal all add time. If any of that applies to your place, you'll hear it before you sign rather than halfway through the job.

  1. Week 0

    Measure, design and quote

    We visit the home, measure the room, check drainage, substrate and access, then produce a scaled layout and a full fixture schedule. You receive a detailed written contract with every item listed by supplier code.

  2. Week 1

    Strip-out and rough-in

    Protection goes down, the room is stripped to frame, and any asbestos is removed by a licensed contractor with a clearance certificate. Plumbing and electrical rough-in follows, along with any framing changes.

  3. Week 2

    Waterproofing and screed

    A licensed waterproofer applies the membrane to AS 3740 with photographic evidence at each coat. Cure times are respected in full, then falls are screeded to the waste.

  4. Week 3

    Tiling and glass measure

    Floor and wall tiling, niches and benches, then grout and silicone. Frameless glass and mirrors are measured off the finished surfaces, never the plans.

  5. Week 4

    Fit-off, clean and handover

    Tapware, toilet, joinery, lighting and accessories installed. Final clean, defect walk-through, then a handover pack with certificates, warranties and care instructions.

At home

Living Without a Bathroom During the Build

No — the room is stripped to the frame. If your home has a second bathroom or powder room we keep it live throughout. Where the renovated room is the only bathroom, we can stage the works or arrange a temporary toilet so the household isn't displaced.

Reviews

What our customers say

Read all reviews

Answers

Bathroom Renovation Process FAQs

Free quote

Book Your Free Measure

Tell us your suburb and roughly what you're after. We measure the room on site, then send a quote with every tile, mixer and fitting listed, so you know exactly what you're paying for before anything starts.

  • Free on-site measure and a scaled layout
  • A written contract with every item listed
  • Licensed, insured, fully documented
  • The same crew from the first call to handover

Free quote

Request your quote

Loading your quote form…

Go to the quote page

Free quote

Ready for a bathroom you're happy to show people?

Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.

Call 0469 905 105