Hills District
Bathroom Renovations Cherrybrook
Cherrybrook homes are mostly 1980s and 90s brick on decent blocks, and the bathrooms are almost all original — tiled to two-thirds height, framed screens, and a vanity with a laminate top.
Because the rooms are usually a reasonable size, we can often improve the layout without moving the whole plumbing wall: turn the bath alcove into a walk-in shower, or swap a single vanity for a wider one with drawers. Many Cherrybrook homes have the main bathroom upstairs, so waterproofing detail and substrate prep are the parts we won't shortcut.

3–4 weeks on site
Most bathrooms finished in three to four weeks, not months
Certified waterproofing
AS 3740 compliant, so leaks don't come back
Fixed quote
Itemised price before work starts, no surprise extras
Sydney bathrooms, one crew
What a Cherrybrook bathroom renovation looks like with us
We've renovated bathrooms across Sydney long enough to know the difference between a 1970s Western Sydney brick home and a new two-storey build in the Hills. Every Cherrybrook bathroom renovation is priced off a real on-site measure, waterproofed to AS 3740, and finished by the same team that started it.
- Licensed NSW builder (Lic. 393475C), fully insured
- Waterproofing certified to AS 3740, with photo records at every coat
- Itemised written quote before demolition — every tile, mixer and fitting listed
- One crew, one supervisor, workmanship warranty
More on how we work: bathroom renovations Sydney · our process · all service areas
Cherrybrook & surrounds
Cherrybrook homes, and what that means for your bathroom
Most of our work sits in the Hills, so a Cherrybrook job isn't a detour for us. Hills homes tend to be double-storey brick with a main bathroom and an ensuite upstairs over timber floors, which changes how we sheet, fall and waterproof the room. We also know how the estate streets and school-run traffic behave, so deliveries and skips are staged rather than dumped on day one.
Housing around Cherrybrook
Solid 1980s brick family homes on large blocks, many still on original bathrooms and laundries.
We also work across the Hills District

What's in your written quote
We measure your Cherrybrook bathroom, work through the layout with you, then put every item in writing — tiles, tapware, waterproofing, rubbish removal. No costs hidden behind a line called "allowances".
Renovating in Cherrybrook
What we usually find in Cherrybrook bathrooms
The age and build of the house sets the scope long before the tiles do. Here's what we plan for around Cherrybrook.
01
Original 80s layouts often waste 1.5m² on a bath nobody uses and a vanity that blocks the door swing.
02
Combining the bathroom and adjoining laundry is a common Cherrybrook move that pays for itself in usable space.
03
Metro-driven resale values here justify stone, frameless glass and quality tapware over builder finishes.
Cherrybrook specifics
How a Cherrybrook bathroom renovation runs
The parts of the job that are specific to this area, worked out at the measure rather than mid-demolition.
Better layout, same plumbing wall
Where the drainage allows, keeping the wet wall saves thousands that can go into the shower, glass and tiling instead.
Upstairs waterproofing
Licensed waterproofer, AS 3740 detailing at every junction, photos at each coat and a certificate at handover.
Storage that actually helps
Drawer-based vanities, a mirrored shaving cabinet and a recessed niche instead of a shelf that collects bottles.
Local proof
Bathrooms we've completed near Cherrybrook
Cherrybrook, Castle Hill and West Pennant Hills are a short run for us, so site visits happen when we say they will.
120+
Hills District bathrooms completed
3–4 weeks
Typical time on site
5.0
Google rating across Sydney jobs

One Bathroom Turned Into Two
A single long bathroom in a Woodcroft family home, reworked into a main bathroom and a separate ensuite so a household of five stopped queueing every morning.
5 weeks on site

Family Bathroom Rebuild
Beige tiles, a laminate vanity and a leaking shower base were replaced with warm veined porcelain, a wall-hung vanity and a fully waterproofed walk-in shower.
4 weeks on site
Questions
Common questions from Cherrybrook homeowners
Short answers to what people ask before booking a measure.
For a like-for-like bathroom renovation, generally no. If the work goes beyond that we'll tell you at the quote stage rather than halfway through.
Yes. Floors get protected, we clean up at the end of each day, and dust is contained to the work area.
Full main bathrooms typically run $23,000 to $36,000, with ensuites from around $18,000. Every line is itemised.
Yes — Cherrybrook is part of our regular run, so our trades and suppliers are already local. No travel surcharge.
Usually within a week. The site measure takes about an hour and you get the quote a few days later.
Three to four weeks. If it's your only bathroom we'll stage the work or sort a temporary option so the household keeps running.
Every job. Done to AS 3740 by a licensed waterproofer, with photos and a compliance certificate handed to you.
Most full renovations land between $22,000 and $38,000. Layout changes and tile choice move the number more than anything else.
NSW Builder Licence #393475C, full insurance, and a workmanship warranty at handover.
Free on-site measure and a written, itemised quote for your Cherrybrook bathroom.
How it works
What happens once you say yes?
Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.
Measure, design and written quote
We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.
Strip-out, rough-in and waterproofing
Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.
Tiling, fit-off and handover
Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.
Free quote
Get a free quote in Cherrybrook
Tell us roughly what you're after. We come out to Cherrybrook, measure the room, and send back a written quote with every fixture and fitting listed.
- Free on-site measure anywhere in Cherrybrook
- A local crew who already work across the Hills District
- A written quote with every tile, mixer and fitting listed
- Licensed, insured, fully documented
Answers
More questions from Cherrybrook homeowners
We hold a NSW Builder Licence (#393475C) and every trade is licensed and insured. You meet the person running your build at the site measure, not after demolition starts. We also provide a detailed written contract with every item listed before work begins, and a workmanship warranty at handover.
Not if we've measured the site properly. Our quote is a detailed written contract that lists every fixture, tile and fitting by supplier code. If there is a risk we can't see — like asbestos or hidden water damage — we itemise a provisional sum upfront so you know the ceiling before you sign, not after the wall is open.
Most full bathroom renovations in Sydney land between $22,000 and $38,000 for a standard 6–8m² room, with premium and larger builds running $40,000 to $70,000+. The variables that move the number most are whether fixtures stay in place, the tile size and format, whether the room contains asbestos, and the standard of tapware and joinery. We give you a detailed written contract after the site measure so the scope and price are clear before you sign.
A standard full renovation takes three to four weeks on site: demolition and rough-in week one, waterproofing and screed week two, tiling week three, fit-off and finishing week four. We keep the rest of your home live wherever possible, and waterproofing membranes need proper cure time — we don't compress that, because it's the single most common cause of failures we're called in to repair.
Usually no. A like-for-like internal bathroom renovation in NSW is generally exempt development. You will need approval if you are altering the external envelope, changing the building's structure, or the property is heritage listed or in a conservation area. Strata apartments need owners corporation approval regardless. We tell you which category you're in at quote stage.
Waterproofing is carried out by a licensed waterproofer to AS 3740 and you receive a certificate of compliance plus photographic evidence of the membrane before tiling. It's covered by our workmanship warranty. We never allow a tiler to 'roll a bit of membrane on' as part of the tiling day.
No — the room is stripped to the frame. If your home has a second bathroom or powder room we keep it live throughout. Where the renovated room is the only bathroom, we can stage the works or arrange a temporary toilet so the household isn't displaced.
We test suspect materials before demolition rather than discovering them mid-job. If asbestos is present, a licensed removalist handles it and you receive a clearance certificate. Where the quote can't anticipate hidden damage, we itemise a provisional sum upfront so you know the ceiling on that risk before you sign.
Other pages Cherrybrook homeowners find useful.
Free quote
Get a free quote for your Cherrybrook bathroom
Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.
