Premium finishes
Luxury Bathroom Renovations in Sydney
Luxury in a bathroom isn't a bigger budget on the same job. It's tighter tolerances. Grout lines that line up around a corner. A niche that sits centred on the tile course instead of wherever it landed. A vanity where the drawer runs clear the skirting. That's what you're actually paying for, and it's why premium bathrooms take longer to set out than to build.
We do this work through Glenhaven, Kenthurst, Dural, Cherrybrook and the acreage pockets around the Hills, where the house is worth doing properly and the owners have already been burnt by a cheap job somewhere else in it.

3–4 weeks on site
Most bathrooms finished in three to four weeks, not months
Certified waterproofing
AS 3740 compliant, so leaks don't come back
Fixed quote
Itemised price before work starts, no surprise extras
Premium finishes
What we do differently on a premium bathroom
Full-slab or large-format stone
Book-matched porcelain slabs or engineered stone with minimal joins. Fewer grout lines is the single clearest signal of a high-end room.
Custom joinery
Vanities built to the millimetre for your room, with soft-close drawers routed around the plumbing rather than boxed off around it.
Freestanding bath and floor mixer
Set out properly with the waste centred and the floor-mounted mixer plumbed before the screed goes down — not chased in afterwards.
Layered lighting
Backlit mirror, a warm wash in the shower niche, dimmable ceiling. Three circuits, so the room works at 7am and at 9pm.
Hidden services
In-wall cisterns, concealed shower mixers, cavity sliders, recessed shaving cabinets. Nothing on show that doesn't need to be.
Underfloor heating and heated rails
Laid under the screed with its own thermostat. Cheap to run, and the difference between a nice bathroom and one you actually enjoy in July.
Premium finishes
Selections take longer than the build
On a premium job we'll spend three or four weeks on selections before a single tile is ordered. Stone gets viewed as a slab, not a sample chip. Tapware finishes get checked against the mirror frame and the shower screen hardware, because brushed brass from two suppliers is rarely the same brass.
You'll see a scaled layout with elevations for every wall before we start, so the tile setout, niche height and mirror position are decided on paper. That's the stage where a luxury bathroom is actually won or lost.
Premium finishes
What premium bathrooms cost
Realistically, a luxury bathroom in Sydney starts around $45,000 and runs to $80,000-plus for a large main bathroom with full-slab stone, custom joinery and a freestanding bath. Ensuite-and-main packages done together usually come in better per room because the trades are already on site.
Every quote is itemised, so if you want the stone but not the underfloor heating, you can see exactly what each decision costs before you commit.

The same crew from start to finish
The membrane is laid and certified before a single tile is set, and the price is itemised line by line in your quote.

Licensed trades, on time
Waterproofing certified to AS 3740, and tiles set out so the cuts land where you won't notice them.
Guides
Further reading on this type of job
More detail on the questions that come up most often on this kind of renovation.
Free on-site measure and a written, itemised quote for your bathroom renovation.
How it works
What happens once you say yes?
Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.
Measure, design and written quote
We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.
Strip-out, rough-in and waterproofing
Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.
Tiling, fit-off and handover
Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.
Questions
Luxury Bathroom Renovations: quick answers
The questions homeowners ask us first, answered plainly.
Three to four weeks on site for a standard bathroom. We give you the start and finish dates in writing before we begin.
Yes. Same crew, same faces, and a text if anything shifts. That's the bit most people tell us went wrong last time.
Only if you change your mind about something. Everything is listed in the contract by name and code before demolition starts.
Absolutely. Come with a Pinterest board or come with nothing — we'll walk you through selections either way.
For a like-for-like internal bathroom, usually not. Strata always needs owners corporation sign-off. We'll tell you which one you are.
We test before we demolish, and anything we can't see is quoted as a provisional sum so you know the ceiling upfront.
Free quote
Get your free measure and written quote
Tell us your suburb and roughly what you're after. We measure the room on site, then send a quote with every tile, mixer and fitting listed, so you know exactly what you're paying for before anything starts.
- Free on-site measure and a scaled layout
- A written contract with every item listed
- Licensed, insured, fully documented
- The same crew from the first call to handover
Answers
Luxury Bathroom Renovations: common questions
Generally $45,000 to $80,000-plus for a main bathroom, depending on stone, joinery and whether the layout changes. The biggest single swings are full-slab stone and custom cabinetry.
Four to six weeks on site, plus three to four weeks of selections and joinery lead time before we start. Stone and custom vanities are usually the long pole, so we order them before demolition rather than during.
Yes, and we prefer it on prestige work. We'll build to their drawings and flag anything that won't work in the real room — falls, setouts, waste positions — before it becomes an on-site argument.
Engineered stone containing crystalline silica was banned from mid-2024, so we use porcelain slabs, natural stone or compliant low-silica alternatives. They look the part and there's no compliance risk down the track.
Often, and it usually makes sense. You share the mobilisation, the waterproofer's visit and the tiler's setup across two rooms. We stage it so you always have one working bathroom in the house.
Other pages homeowners find useful at this stage.
Free quote
Ready for a bathroom you're happy to show people?
Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.
