What it really costs

Bathroom Renovation Costs in Sydney: What You'll Actually Pay

The first question almost everyone asks is what a bathroom renovation costs. The honest answer is that anyone who gives you a number over the phone is guessing, and a guess is exactly what turns into a variation later. What we can do is show you the real ranges we quote across the Hills and Western Sydney, and explain what moves a price from one end of the range to the other.

Most bathrooms we build out here land between $22,000 and $38,000. Below that you're usually looking at a partial refresh. Above it you're moving walls, moving plumbing, or buying premium stone and tapware. None of those are wrong — they're just different jobs.

Completed Quakers Hill bathroom renovation with stone-top vanity and frameless shower

3–4 weeks on site

Most bathrooms finished in three to four weeks, not months

Certified waterproofing

AS 3740 compliant, so leaks don't come back

Fixed quote

Itemised price before work starts, no surprise extras

What it really costs

Bathroom renovation costs in Sydney by size and scope

Ranges below are for a full strip-out and rebuild by licensed trades, with certified waterproofing and a written contract. They include labour, materials and rubbish removal.

Type of jobTypical sizeIndicative range
Cosmetic refresh (fixtures stay put)Any$12,000 – $18,000
Small bathroom or ensuite, same layout3 – 5 m²$18,000 – $28,000
Main family bathroom, same layout6 – 9 m²$24,000 – $34,000
Main bathroom with layout change6 – 9 m²$30,000 – $45,000
Premium / stone and custom joinery8 m²+$45,000 +

Indicative Sydney ranges — confirmed only after an on-site measure.

What it really costs

What actually pushes the price up

Six things account for almost every difference between two quotes on the same room.

Moving the plumbing

Shifting a toilet or shower waste means cutting the slab or reworking the floor joists. It's the single biggest jump in any quote — usually a few thousand on its own.

Tile size and layout

600x1200 porcelain laid floor-to-ceiling takes longer to set out and costs more to lay than a half-height tile. Herringbone and mosaic cost more again in labour, not materials.

Tapware and fixtures

The gap between decent mid-range tapware and designer brassware across one bathroom is easily $2,000 to $4,000. It's the easiest line to dial up or down.

Vanity and joinery

An off-the-shelf wall-hung vanity versus a custom unit with a stone top is a $1,500 to $6,000 decision, depending on the stone.

What's behind the wall

Rotten studs, old galvanised pipe or a rusted-out floor waste only show up on strip-out day. We allow for it honestly rather than pretending it can't happen.

Access

Second-storey bathrooms, tight terrace lanes and unit buildings with lift bookings all add labour hours nobody thinks about until the tiles need carrying up.

What it really costs

What a cheap quote usually leaves out

If one quote is $8,000 under the others, it isn't magic. It's scope. Check these line by line before you sign anything.

  • Waterproofing certificate from a licensed applicator, compliant with AS 3740
  • Removal and disposal of the old bathroom, including asbestos testing on pre-1990 homes
  • Making good the plaster, cornice and paint outside the bathroom door
  • A provisional sum for tapware and fittings versus your actual selections
  • Shower screen, mirror, towel rails and accessories — often quoted 'excluded'
  • Electrical work: new circuits, exhaust fan, heated towel rail, downlights and certificate

What it really costs

How we price a bathroom

We come out, measure the room, look at what's under the floor and behind the wall, and talk through what you actually want to change. Then we send a written itemised quote — every tile, mixer, vanity and fitting listed with its allowance, so you can compare it line for line against anyone else's.

If something unexpected shows up during strip-out, you get a written variation with a price before we do the work. Not after. That's the whole point of quoting properly in the first place.

Remodler bathroom renovators in branded shirts after a bathroom renovation cost

The same crew from start to finish

The membrane is laid and certified before a single tile is set, and the price is itemised line by line in your quote.

Remodler branded van and ute parked on the street outside a Sydney home

Licensed trades, on time

Waterproofing certified to AS 3740, and tiles set out so the cuts land where you won't notice them.

Guides

Further reading on this type of job

More detail on the questions that come up most often on this kind of renovation.

Free on-site measure and a written, itemised quote for your bathroom renovation.

How it works

What happens once you say yes?

Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.

Stage 1

Measure, design and written quote

We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.

Stage 2

Strip-out, rough-in and waterproofing

Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.

Stage 3

Tiling, fit-off and handover

Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.

View Projects

Reviews

What our customers say

Read all reviews

Questions

Bathroom Renovation Cost: quick answers

The questions homeowners ask us first, answered plainly.

Free quote

Get your free measure and written quote

Tell us your suburb and roughly what you're after. We measure the room on site, then send a quote with every tile, mixer and fitting listed, so you know exactly what you're paying for before anything starts.

  • Free on-site measure and a scaled layout
  • A written contract with every item listed
  • Licensed, insured, fully documented
  • The same crew from the first call to handover

Free quote

Request your quote

Four quick details is all we need. Add photos or notes if it helps.

No obligation. We never share your details.

Answers

Bathroom Renovation Cost: common questions

Free quote

Ready for a bathroom you're happy to show people?

Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.