Western Sydney
Bathroom Renovations Richmond
Richmond bathrooms tend to be either an original in an older cottage or a tired 1990s update that's due for a proper rebuild.
In both cases we take it back to frame, check the sub-floor and drainage, re-set the falls and waterproof to AS 3740. Once the room is sound, the layout usually improves without much extra cost: bath out, walk-in shower in, wider vanity, and an exhaust that vents outside instead of into the roof. Access out here is easy, so materials get staged and the driveway stays clear.

3–4 weeks on site
Most bathrooms finished in three to four weeks, not months
Certified waterproofing
AS 3740 compliant, so leaks don't come back
Fixed quote
Itemised price before work starts, no surprise extras
Sydney bathrooms, one crew
What a Richmond bathroom renovation looks like with us
We've renovated bathrooms across Sydney long enough to know the difference between a 1970s Western Sydney brick home and a new two-storey build in the Hills. Every Richmond bathroom renovation is priced off a real on-site measure, waterproofed to AS 3740, and finished by the same team that started it.
- Licensed NSW builder (Lic. 393475C), fully insured
- Waterproofing certified to AS 3740, with photo records at every coat
- Itemised written quote before demolition — every tile, mixer and fitting listed
- One crew, one supervisor, workmanship warranty
More on how we work: bathroom renovations Sydney · our process · all service areas
Richmond & surrounds
Richmond homes, and what that means for your bathroom
Western Sydney bathrooms fall into two camps: original 70s–90s wet areas that were never properly membraned, and fast-built estate homes with falls that don't quite meet the standard. Around Richmond we strip back to the substrate, water-test before tiling, and rebuild the room properly instead of resurfacing over a problem you'd meet again in two years.
Housing around Richmond
Historic cottages near the town centre, rural-residential blocks and a band of 80s–90s brick family homes.
We also work across Western Sydney

What's in your written quote
We measure your Richmond bathroom, work through the layout with you, then put every item in writing — tiles, tapware, waterproofing, rubbish removal. No costs hidden behind a line called "allowances".
Renovating in Richmond
What we usually find in Richmond bathrooms
The age and build of the house sets the scope long before the tiles do. Here's what we plan for around Richmond.
01
Older Richmond cottages often sit on stumps; sub-floor ventilation and joist condition get assessed before design.
02
Rural blocks on tank water need pressure-appropriate tapware and, sometimes, a pump upgrade.
03
Hawkesbury flood overlays affect insurance and material choice on lower-lying streets.
Richmond specifics
How a Richmond bathroom renovation runs
The parts of the job that are specific to this area, worked out at the measure rather than mid-demolition.
Rebuild, not a re-tile
Tiles come off with the render on most Richmond jobs, so we plan for a full rebuild rather than pretending otherwise.
Layout wins that are cheap
Swapping the bath alcove for a walk-in shower often costs little more than replacing like-for-like.
Country-edge logistics
Deliveries staged, street parking, driveway kept clear, and a daily clean-up.
Local proof
Bathrooms we've completed near Richmond
We give Hawkesbury jobs the same crew and the same program as anything closer in.
180+
Bathrooms completed nearby
3–4 weeks
Typical time on site
5.0
Google rating across Sydney jobs

Frameless Shower Renovation
A compact Blacktown bathroom rebuilt with a frameless glass shower, matte black tapware and a full-height stone-look tile that makes the room feel far bigger.
3 weeks on site

Family Bathroom Rebuild
Beige tiles, a laminate vanity and a leaking shower base were replaced with warm veined porcelain, a wall-hung vanity and a fully waterproofed walk-in shower.
4 weeks on site
Questions
Common questions from Richmond homeowners
Short answers to what people ask before booking a measure.
Yes. Richmond, Windsor and the surrounding Hawkesbury suburbs are in our standard service area.
Three to four weeks on site for a standard bathroom, with start and finish dates given in writing.
Most full renovations sit between $20,000 and $32,000, itemised so you can compare it properly.
Yes — Richmond is part of our regular run, so our trades and suppliers are already local. No travel surcharge.
Usually within a week. The site measure takes about an hour and you get the quote a few days later.
Three to four weeks. If it's your only bathroom we'll stage the work or sort a temporary option so the household keeps running.
Every job. Done to AS 3740 by a licensed waterproofer, with photos and a compliance certificate handed to you.
Most full renovations land between $22,000 and $38,000. Layout changes and tile choice move the number more than anything else.
NSW Builder Licence #393475C, full insurance, and a workmanship warranty at handover.
Free on-site measure and a written, itemised quote for your Richmond bathroom.
How it works
What happens once you say yes?
Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.
Measure, design and written quote
We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.
Strip-out, rough-in and waterproofing
Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.
Tiling, fit-off and handover
Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.
Free quote
Get a free quote in Richmond
Tell us roughly what you're after. We come out to Richmond, measure the room, and send back a written quote with every fixture and fitting listed.
- Free on-site measure anywhere in Richmond
- A local crew who already work across the Western Sydney
- A written quote with every tile, mixer and fitting listed
- Licensed, insured, fully documented
Answers
More questions from Richmond homeowners
We hold a NSW Builder Licence (#393475C) and every trade is licensed and insured. You meet the person running your build at the site measure, not after demolition starts. We also provide a detailed written contract with every item listed before work begins, and a workmanship warranty at handover.
Not if we've measured the site properly. Our quote is a detailed written contract that lists every fixture, tile and fitting by supplier code. If there is a risk we can't see — like asbestos or hidden water damage — we itemise a provisional sum upfront so you know the ceiling before you sign, not after the wall is open.
Most full bathroom renovations in Sydney land between $22,000 and $38,000 for a standard 6–8m² room, with premium and larger builds running $40,000 to $70,000+. The variables that move the number most are whether fixtures stay in place, the tile size and format, whether the room contains asbestos, and the standard of tapware and joinery. We give you a detailed written contract after the site measure so the scope and price are clear before you sign.
A standard full renovation takes three to four weeks on site: demolition and rough-in week one, waterproofing and screed week two, tiling week three, fit-off and finishing week four. We keep the rest of your home live wherever possible, and waterproofing membranes need proper cure time — we don't compress that, because it's the single most common cause of failures we're called in to repair.
Usually no. A like-for-like internal bathroom renovation in NSW is generally exempt development. You will need approval if you are altering the external envelope, changing the building's structure, or the property is heritage listed or in a conservation area. Strata apartments need owners corporation approval regardless. We tell you which category you're in at quote stage.
Waterproofing is carried out by a licensed waterproofer to AS 3740 and you receive a certificate of compliance plus photographic evidence of the membrane before tiling. It's covered by our workmanship warranty. We never allow a tiler to 'roll a bit of membrane on' as part of the tiling day.
No — the room is stripped to the frame. If your home has a second bathroom or powder room we keep it live throughout. Where the renovated room is the only bathroom, we can stage the works or arrange a temporary toilet so the household isn't displaced.
We test suspect materials before demolition rather than discovering them mid-job. If asbestos is present, a licensed removalist handles it and you receive a clearance certificate. Where the quote can't anticipate hidden damage, we itemise a provisional sum upfront so you know the ceiling on that risk before you sign.
Other pages Richmond homeowners find useful.
Free quote
Get a free quote for your Richmond bathroom
Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.
