Western Sydney
Bathroom Renovations The Ponds
The Ponds is almost all 2008-onwards project homes, and the bathrooms are the part of the house owners tend to change first.
Layouts are consistent and the plumbing is modern, so most jobs here are upgrades rather than rebuilds: wider level-entry shower, semi-frameless glass, large-format tile, stone top and a drawer vanity that actually holds things. Main bathrooms are typically upstairs, so we stiffen and sheet the floor before the waterproofer starts.

3–4 weeks on site
Most bathrooms finished in three to four weeks, not months
Certified waterproofing
AS 3740 compliant, so leaks don't come back
Fixed quote
Itemised price before work starts, no surprise extras
Sydney bathrooms, one crew
Renovating a bathroom in The Ponds?
Across Sydney we do one thing: bathrooms. Full renovations, ensuites, laundries and shower rebuilds — nothing else competing for the crew's attention. That focus is what lets us hold a three to four week build in The Ponds instead of leaving a room half-tiled while the trades chase another site.
- Licensed NSW builder (Lic. 393475C), fully insured
- Waterproofing certified to AS 3740, with photo records at every coat
- Itemised written quote before demolition — every tile, mixer and fitting listed
- One crew, one supervisor, workmanship warranty
More on how we work: bathroom renovations Sydney · our process · all service areas
The Ponds & surrounds
The Ponds homes, and what that means for your bathroom
Western Sydney bathrooms fall into two camps: original 70s–90s wet areas that were never properly membraned, and fast-built estate homes with falls that don't quite meet the standard. Around The Ponds we strip back to the substrate, water-test before tiling, and rebuild the room properly instead of resurfacing over a problem you'd meet again in two years.
Housing around The Ponds
Master-planned family homes from the late 2000s, typically with main bath, ensuite and powder room.
We also work across Western Sydney

What's in your written quote
We measure your The Ponds bathroom, work through the layout with you, then put every item in writing — tiles, tapware, waterproofing, rubbish removal. No costs hidden behind a line called "allowances".
Renovating in The Ponds
What we usually find in The Ponds bathrooms
The age and build of the house sets the scope long before the tiles do. Here's what we plan for around The Ponds.
01
Kid-heavy households do better with a bath kept in the main and slip-rated floor tiles throughout.
02
Semi-frameless screens and tiled hobs reduce the leak points that plague fifteen-year-old estate showers.
03
Back-to-back layouts here let us renovate two rooms with one set of plumbing works.
The Ponds specifics
How a The Ponds bathroom renovation runs
The parts of the job that are specific to this area, worked out at the measure rather than mid-demolition.
Familiar floorplans
We've worked in these homes repeatedly, which means fewer unknowns and pricing that holds.
Level-entry shower
Removing the hob and stepping the floor properly is the change that makes the biggest visual difference.
Both wet areas in one run
Main and ensuite together saves a second mobilisation of waterproofer, tiler and plumber.
Local proof
Bathrooms we've completed near The Ponds
The Ponds, Stanhope Gardens and Kellyville Ridge are all inside our regular weekly run.
180+
Bathrooms completed nearby
3–4 weeks
Typical time on site
5.0
Google rating across Sydney jobs

Gold & Marble Ensuite
A statement ensuite for a new Marsden Park home — double gold vessel basins, brushed brass tapware, a freestanding bath and a black feature shower.
4 weeks on site

Luxury Main Bathroom
A tired 1990s main bathroom stripped back to studs and rebuilt as a bright, hotel-style room with marble-look porcelain, a lit niche and a stone-top timber vanity.
4 weeks on site
Questions
Common questions from The Ponds homeowners
Short answers to what people ask before booking a measure.
Yes. We select tile, tapware and joinery to sit with your existing floors and kitchen rather than fighting them.
Around two and a half to three weeks on site, with dates in writing before we begin.
Ensuites usually run $18,000 to $26,000 and main bathrooms $22,000 to $34,000.
Yes — The Ponds is part of our regular run, so our trades and suppliers are already local. No travel surcharge.
Usually within a week. The site measure takes about an hour and you get the quote a few days later.
Three to four weeks. If it's your only bathroom we'll stage the work or sort a temporary option so the household keeps running.
Every job. Done to AS 3740 by a licensed waterproofer, with photos and a compliance certificate handed to you.
Most full renovations land between $22,000 and $38,000. Layout changes and tile choice move the number more than anything else.
NSW Builder Licence #393475C, full insurance, and a workmanship warranty at handover.
Free on-site measure and a written, itemised quote for your The Ponds bathroom.
How it works
What happens once you say yes?
Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.
Measure, design and written quote
We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.
Strip-out, rough-in and waterproofing
Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.
Tiling, fit-off and handover
Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.
Free quote
Get a free quote in The Ponds
Tell us roughly what you're after. We come out to The Ponds, measure the room, and send back a written quote with every fixture and fitting listed.
- Free on-site measure anywhere in The Ponds
- A local crew who already work across the Western Sydney
- A written quote with every tile, mixer and fitting listed
- Licensed, insured, fully documented
Answers
More questions from The Ponds homeowners
We hold a NSW Builder Licence (#393475C) and every trade is licensed and insured. You meet the person running your build at the site measure, not after demolition starts. We also provide a detailed written contract with every item listed before work begins, and a workmanship warranty at handover.
Not if we've measured the site properly. Our quote is a detailed written contract that lists every fixture, tile and fitting by supplier code. If there is a risk we can't see — like asbestos or hidden water damage — we itemise a provisional sum upfront so you know the ceiling before you sign, not after the wall is open.
Most full bathroom renovations in Sydney land between $22,000 and $38,000 for a standard 6–8m² room, with premium and larger builds running $40,000 to $70,000+. The variables that move the number most are whether fixtures stay in place, the tile size and format, whether the room contains asbestos, and the standard of tapware and joinery. We give you a detailed written contract after the site measure so the scope and price are clear before you sign.
A standard full renovation takes three to four weeks on site: demolition and rough-in week one, waterproofing and screed week two, tiling week three, fit-off and finishing week four. We keep the rest of your home live wherever possible, and waterproofing membranes need proper cure time — we don't compress that, because it's the single most common cause of failures we're called in to repair.
Usually no. A like-for-like internal bathroom renovation in NSW is generally exempt development. You will need approval if you are altering the external envelope, changing the building's structure, or the property is heritage listed or in a conservation area. Strata apartments need owners corporation approval regardless. We tell you which category you're in at quote stage.
Waterproofing is carried out by a licensed waterproofer to AS 3740 and you receive a certificate of compliance plus photographic evidence of the membrane before tiling. It's covered by our workmanship warranty. We never allow a tiler to 'roll a bit of membrane on' as part of the tiling day.
No — the room is stripped to the frame. If your home has a second bathroom or powder room we keep it live throughout. Where the renovated room is the only bathroom, we can stage the works or arrange a temporary toilet so the household isn't displaced.
We test suspect materials before demolition rather than discovering them mid-job. If asbestos is present, a licensed removalist handles it and you receive a clearance certificate. Where the quote can't anticipate hidden damage, we itemise a provisional sum upfront so you know the ceiling on that risk before you sign.
Other pages The Ponds homeowners find useful.
Free quote
Get a free quote for your The Ponds bathroom
Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.
