Western Sydney
Bathroom Renovations Winston Hills
Winston Hills bathrooms are typically 1970s originals: a steel bath, a window in the shower wall, and tiling that stops two-thirds up.
Blocks here often slope, so we check sub-floor access and where the waste can run before proposing any layout change. Once the room is stripped we usually find the shower had no proper fall and the membrane was a painted coat. Rebuilding it properly is the job — new fall, new membrane to AS 3740, then the walk-in shower and wider vanity most families here actually want.

3–4 weeks on site
Most bathrooms finished in three to four weeks, not months
Certified waterproofing
AS 3740 compliant, so leaks don't come back
Fixed quote
Itemised price before work starts, no surprise extras
Sydney bathrooms, one crew
What a Winston Hills bathroom renovation looks like with us
We've renovated bathrooms across Sydney long enough to know the difference between a 1970s Western Sydney brick home and a new two-storey build in the Hills. Every Winston Hills bathroom renovation is priced off a real on-site measure, waterproofed to AS 3740, and finished by the same team that started it.
- Licensed NSW builder (Lic. 393475C), fully insured
- Waterproofing certified to AS 3740, with photo records at every coat
- Itemised written quote before demolition — every tile, mixer and fitting listed
- One crew, one supervisor, workmanship warranty
More on how we work: bathroom renovations Sydney · our process · all service areas
Winston Hills & surrounds
Winston Hills homes, and what that means for your bathroom
Western Sydney bathrooms fall into two camps: original 70s–90s wet areas that were never properly membraned, and fast-built estate homes with falls that don't quite meet the standard. Around Winston Hills we strip back to the substrate, water-test before tiling, and rebuild the room properly instead of resurfacing over a problem you'd meet again in two years.
Housing around Winston Hills
1970s brick homes on sloping blocks, many split-level, with compact original wet areas.
We also work across Western Sydney

What's in your written quote
We measure your Winston Hills bathroom, work through the layout with you, then put every item in writing — tiles, tapware, waterproofing, rubbish removal. No costs hidden behind a line called "allowances".
Renovating in Winston Hills
What we usually find in Winston Hills bathrooms
The age and build of the house sets the scope long before the tiles do. Here's what we plan for around Winston Hills.
01
70s wet areas rarely have a membrane at all; the whole substrate comes out and is rebuilt to AS 3740.
02
Split-level layouts complicate drainage falls — we survey the existing waste run before finalising fixtures.
03
Louvre windows and no exhaust means condensation damage; mechanical ventilation is non-negotiable.
Winston Hills specifics
How a Winston Hills bathroom renovation runs
The parts of the job that are specific to this area, worked out at the measure rather than mid-demolition.
Shower falls set out properly
Screed and falls are planned to the waste position, so water goes where it should rather than pooling at the door.
Windows in wet walls
Old aluminium windows inside shower zones get flashed and sealed correctly, or relocated if the layout suits it better.
Sloping-block drainage
We confirm what the existing drainage will allow before we price a moved shower or vanity.
Local proof
Bathrooms we've completed near Winston Hills
Baulkham Hills, Northmead and Winston Hills are all short runs for us — site visits happen on the day we say.
180+
Bathrooms completed nearby
3–4 weeks
Typical time on site
Licensed, AS 3740, certificate at handover
Waterproofing

One Bathroom Turned Into Two
A single long bathroom in a Woodcroft family home, reworked into a main bathroom and a separate ensuite so a household of five stopped queueing every morning.
5 weeks on site

Frameless Shower Renovation
A compact Blacktown bathroom rebuilt with a frameless glass shower, matte black tapware and a full-height stone-look tile that makes the room feel far bigger.
3 weeks on site
Questions
Common questions from Winston Hills homeowners
Short answers to what people ask before booking a measure.
Usually yes. We confirm the drainage at the measure and, if it works, that swap is the single biggest improvement in most Winston Hills bathrooms.
Always, and we duct it outside rather than into the roof space.
Most full bathrooms come in between $21,000 and $33,000, itemised line by line.
Yes — Winston Hills is part of our regular run, so our trades and suppliers are already local. No travel surcharge.
Usually within a week. The site measure takes about an hour and you get the quote a few days later.
Three to four weeks. If it's your only bathroom we'll stage the work or sort a temporary option so the household keeps running.
Every job. Done to AS 3740 by a licensed waterproofer, with photos and a compliance certificate handed to you.
Most full renovations land between $22,000 and $38,000. Layout changes and tile choice move the number more than anything else.
NSW Builder Licence #393475C, full insurance, and a workmanship warranty at handover.
Free on-site measure and a written, itemised quote for your Winston Hills bathroom.
How it works
What happens once you say yes?
Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.
Measure, design and written quote
We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.
Strip-out, rough-in and waterproofing
Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.
Tiling, fit-off and handover
Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.
Free quote
Get a free quote in Winston Hills
Tell us roughly what you're after. We come out to Winston Hills, measure the room, and send back a written quote with every fixture and fitting listed.
- Free on-site measure anywhere in Winston Hills
- A local crew who already work across the Western Sydney
- A written quote with every tile, mixer and fitting listed
- Licensed, insured, fully documented
Answers
More questions from Winston Hills homeowners
We hold a NSW Builder Licence (#393475C) and every trade is licensed and insured. You meet the person running your build at the site measure, not after demolition starts. We also provide a detailed written contract with every item listed before work begins, and a workmanship warranty at handover.
Not if we've measured the site properly. Our quote is a detailed written contract that lists every fixture, tile and fitting by supplier code. If there is a risk we can't see — like asbestos or hidden water damage — we itemise a provisional sum upfront so you know the ceiling before you sign, not after the wall is open.
Most full bathroom renovations in Sydney land between $22,000 and $38,000 for a standard 6–8m² room, with premium and larger builds running $40,000 to $70,000+. The variables that move the number most are whether fixtures stay in place, the tile size and format, whether the room contains asbestos, and the standard of tapware and joinery. We give you a detailed written contract after the site measure so the scope and price are clear before you sign.
A standard full renovation takes three to four weeks on site: demolition and rough-in week one, waterproofing and screed week two, tiling week three, fit-off and finishing week four. We keep the rest of your home live wherever possible, and waterproofing membranes need proper cure time — we don't compress that, because it's the single most common cause of failures we're called in to repair.
Usually no. A like-for-like internal bathroom renovation in NSW is generally exempt development. You will need approval if you are altering the external envelope, changing the building's structure, or the property is heritage listed or in a conservation area. Strata apartments need owners corporation approval regardless. We tell you which category you're in at quote stage.
Waterproofing is carried out by a licensed waterproofer to AS 3740 and you receive a certificate of compliance plus photographic evidence of the membrane before tiling. It's covered by our workmanship warranty. We never allow a tiler to 'roll a bit of membrane on' as part of the tiling day.
No — the room is stripped to the frame. If your home has a second bathroom or powder room we keep it live throughout. Where the renovated room is the only bathroom, we can stage the works or arrange a temporary toilet so the household isn't displaced.
We test suspect materials before demolition rather than discovering them mid-job. If asbestos is present, a licensed removalist handles it and you receive a clearance certificate. Where the quote can't anticipate hidden damage, we itemise a provisional sum upfront so you know the ceiling on that risk before you sign.
Other pages Winston Hills homeowners find useful.
Free quote
Get a free quote for your Winston Hills bathroom
Tell us your suburb and what you're after. We measure up on site and send back a written quote with the price and the timeline set out clearly.